Church Replaces More Than Fifty Windows

The original 60” h. x 38” w. windows featured a single pane, stained glass, and metal frame design that was visually interesting. However, over 50 years they had lost their functionality, becoming drafty and costly to repair and maintain. Our team worked with the Church to produce a design styled like their windows located within the connecting lobby of The Church and Parish Hall.

To limit disturbances inside the church - and on the busy city streets - a phased approach was implemented for the schedule of work. For example, the upper-level windows were replaced first, followed by the lower level. This strategy limited the man lift time on the site.

Teaming with Marvin Windows and D&S Elite Construction, our strategy proved to be so successful that the project finished almost three weeks ahead of schedule - the removal and installation of 51-custom made, double-insulated glazed, aluminum-clad windows was completed in just 36 days!